5. The EPSON RC+ 5.0 GUI
62 EPSON RC+ 5.0 (Ver.5.4) User's Guide Rev.4
4. Verify the import source, import project, and destination project. Check Open
Destination Project After Import
if you want the project to open after import.
5. Click the
Import button. If the destination project already exists, you will be asked if
you want to overwrite it.
Importing a Controller Status project
For projects using Vision Guide, the calibration data and model files are not imported from
the Controller Status folder because they are not stored there. After import, you will need
to re-teach the vision models and perform the calibrations.
Follow these steps to import a project from a controller status folder:
1. Select Import from the Project Menu to open the Import Project dialog.
2. Select
Controller Status Folder and click Next.
)
NOTE